Presolicitation NAICS 811210

H159--VANIHCS 3 Year Electrical Testing Marion and Fort Wayne

🏢 VETERANS AFFAIRS, DEPARTMENT OF 📅 Posted 2025-10-20 ⏳ Due 2025-11-14T15:00:00+00:00
Clean, test, adjust, calibrate, inspect and retorque all the below mentioned electrical distribution apparatus. This shall include, but not be limited to, power transformers, switchgear, motor control centers, distribution centers, panel boards, air circuit breaker, vacuum circuit breakers, and loop switches listed in Attachment I SOW Attachments. Over-current testing apparatus shall be limited to over-current relays for each 15 KV and 5 KV circuit breaker. Megger voltage shall not exceed IEEE standards. No high pot voltage to be applied to feeder wires. All equipment will be isolated from panel and feeders during testing for proper data reading. No variance. Contractor is responsible to reinstall equipment to original condition, verifying voltage, phasing and rotation. Any damage to equipment due to contractor neglect is the contractor s financial responsibility. Repairs outside this SOW will be at an additional charge to the VA and require prior approval from the COR and Contracting Officer before repairs are started.

Notice ID: feac9481c0e74fe0983d2a59f2c924fb · View on SAM.gov ↗

Explore more federal-contracting data

Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency

Win more federal contracts

BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.

Sign up free - 14-day trial, no card required