Solicitation NAICS 237310

Culvert Replacement Meadow Creek

🏢 AGRICULTURE, DEPARTMENT OF 📅 Posted 2025-10-02 ⏳ Due 2025-10-30T19:00:00+00:00
10-2-2025 - UPDATE - Site Visit is hereby CANCELED A new date will be esatblished once the Government Shutdown concludes. The culvert at Meadow Creek has failed and is need of replacement. This is in a live stream (meadow creek) and the water is creating a void under the road as it erodes causing the road to settle and create a hazardous situation. The 72” diameter pipe is located on the West Dolores Road (NFSR 535) at milepost 24.72 just past burro bridge. The objective is to replace the pipe with a steel polycoated culvert that will resist rusting from the mineral content in the stream. A bypass road will be constructed to allow continued traffic throughout the duration of the project which is anticipated to last two weeks. Rip-rap will be collected on-site and commercially purchased ¾”-minus road base will be used for surfacing. See attached SOW, Specs, and Drawings for full project Requirements

Notice ID: e87ca81b7c364b51a87465d1fb62eacf · View on SAM.gov ↗

Explore more federal-contracting data

Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency

Win more federal contracts

BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.

Sign up free - 14-day trial, no card required