Solicitation
NAICS 541690
Artifact Relocation Missile Move Survey
The Contractor shall support the Government in achieving all project tasks and subtasks based on the overview and description of work area listed in Section 1.6.1, 1.6.2, and 1.6.3. Details of the Contractor support required for each task are broken down into subtasks as described below, divided into distinct locations of the work. 1.6.1 Static Displays B500/B1000 1.6.1.1 Investigate/evaluate the missiles at their current location to provide a study. Study to provide the following information: Total estimated weight of each Missile. What is the height of concrete fill inside each Missile and estimated weight. Is the concrete used for structural purposes or ballast only? What is the condition of exterior and internal structure for the 1st, 2nd and 3rd stages of the Missiles? What is the internal structure made of? How are structural steel supports fastened internally? How are each stage of the Missiles connected? Are there internal components of each stage remaining or removed? Is the exterior skin of the Missiles original or have they been replaced or covered? What are the required repairs for the safe removal, transport, reinstall and refurbishment of each Missile. 1.6.1.2 Deconst...
Notice ID: d5ed3149a010410c9c0a7d3372bbfd55 ·
View on SAM.gov ↗
Explore more federal-contracting data
Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency
Win more federal contracts
BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.
Sign up free - 14-day trial, no card required