Sources Sought
NAICS 237990
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newtons Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newtons Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. See attached document for addiitional information.
Notice ID: c8c4909dc5cc4c27be47d75bf938332b ·
View on SAM.gov ↗
Explore more federal-contracting data
Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency
Win more federal contracts
BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.
Sign up free - 14-day trial, no card required