Solicitation NAICS 238210

RESIZING SSBJ CABLE FOR DRY TRANSFORMERS

🏢 STATE, DEPARTMENT OF 📅 Posted 2025-10-31 ⏳ Due 2025-11-12T19:00:00+00:00
The U.S. Embassy in Mexico City has a requirement for a professional contractor to provide materials and labor, to increase the size of the Supply Side Bonding Jumper (SSBJ) at the secondary side of the LV Dry Transformers of the Mexico City NEC electrical system. The work is required to be performed in the Mexico City New Embassy Compound, located at Col. Irrigación, Alcaldía Miguel Hidalgo. The existing Supply Side Bonding Jumpers (SSBJ) are undersized for dry type transformers sizes 15, 45, 75, 112.5, and 150 kVA, as well as the especial cases for 30 kVA transformers with 2/0 AWG secondary feeder and 112.5 kVA with (2) 2/0 AWG secondary feeders. Per NEC 2011, article 250.102 the SSBJ (between secondary and OCPD) need to be increased. The awarded contractor will perform the work to increase the grounding cable size (Supply Side Bonding Jumpers, SSBJ) which runs from the LV secondary side to the first panelboard of all dry transformers located into electrical rooms at New Office Building (NOB) and Parking Building (PKG). All construction contractors that respond to the solicitation must be technically qualified and financially responsible to perform the work. At a minimum, each of...

Notice ID: c34f163692e341af9b1cea157bd81c3c · View on SAM.gov ↗

Explore more federal-contracting data

Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency

Win more federal contracts

BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.

Sign up free - 14-day trial, no card required