Sources Sought
NAICS 237130
Ft. Buchanan Microgrid
Description: A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business, and you are interested in this project please respond appropriately. Project Location: Fort Buchanan, Puerto Rico Project Description: Develop an installation-level microgrid at Fort Buchanan, comprising four continuous-duty 2 MW diesel generators and a 5 MWh battery energy storage system (BESS). This project is Design/Bid/Build and will integrate a comprehensive microgrid control system, encompassing paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying, and fiber optic communication connections. To ensure continuous operation of critical systems for 14 days, twelve 12,000-gallon above-ground, ballistic-resistant diesel fuel tanks with a fuel polishing system will be installed. The microgrid will integrate existing large-scale onsite renewable energy generation: a 4.65 MW solar photovoltaic (PV) array and two 275 kW wind turbines. The pr...
Notice ID: b0565f063a0a4f7a8e6937edc4531818 ·
View on SAM.gov ↗
Explore more federal-contracting data
Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency
Win more federal contracts
BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.
Sign up free - 14-day trial, no card required