Combined Synopsis/Solicitation
NAICS 238210
Building 504 Electrical Outlets
The contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Specifications, Environmental Contractor Technical Specifications, UFC 1-200-01 (DoD Building Code), and NFPA 70 (National Electrical Code).
The technical execution requires a Stormwater Pollution Prevention Plan (SWPPP) to manage runoff and eliminate Foreign Object Debris (FOD). Physical works include trenching from the transformer to a distribution rack positioned ten feet behind it, followed by running 160 feet of overhead power lines on three newly installed utility poles (Poles #1, #2, and #3) to B504. These utility poles must not exceed the 28-foot height of the neighboring B502. Hydro trenching is restricted to a ten-foot stretch from the transformer to the rack and a three-foot diameter around each utility pole.
The electrical infrastructure demands 180 feet of 2 ½ inch conduit and properly sized wiring to support six 480-volt weatherproof twist-lock receptacles, complete with dedicated disconnect switc...
Notice ID: a6bf71202f2f44aba5f20be40056f26b ·
View on SAM.gov ↗
Explore more federal-contracting data
Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency
Win more federal contracts
BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.
Sign up free - 14-day trial, card at signup