Solicitation NAICS 237990

Hulah Lake Toe Drain, Bowring, Oklahoma

🏢 DEPT OF DEFENSE 📅 Posted 2025-07-23 ⏳ Due 2025-07-30T19:00:00+00:00
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.

Notice ID: 92da8bd6579b44ee9bf870fe88649d60 · View on SAM.gov ↗

Explore more federal-contracting data

Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency

Win more federal contracts

BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.

Sign up free - 14-day trial, no card required