Replace Roofs 682, 1408, and 1409-Amendment 0001

🏢 DEPT OF DEFENSE 📅 Posted 2025-09-24 ⏳ Due 2025-09-26T17:00:00+00:00
RFIs - 24 September 2025 RFI Question: Does Bldg 1408 and 1409 need a NEW lightning protection system, including new downleads and grounds, to meet the requirements provided in the amendment? Response: Just the points that are in contact with new roof system. The Lightening Protection is on both buildings now. The problem is that, its copper. We are changing the roof system from concrete tils to a steel roof system. Copper cannot be used on a metal roof system. So all points connected to the new roof system has the be aluminum. In the attic, these parts will be converted from aluminum back to copper wire in the attic per code. RFI Question: To clarify, does the lightning protection system need to be installed on all 3 buildings or just BLDG 1408 as shown in the updated drawing? Response: Buildings 1408 and 1409 are the same buildings, therefore lightening protection will need to be included for buildings 1408 and 1409. Amendment 001 - 23 September 2025 The purpose of this Amendment is to: a) To extend the proposal receipt date to 12PM CDT, 26 September 2025. b) Add updated drawings for this requirement (Note drawings Building 862; to read Remove concrete tiles. Repair decking and i...

Notice ID: 85f9f1de936e4d38a6d692759f1f504a · View on SAM.gov ↗

Explore more federal-contracting data

Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency

Win more federal contracts

BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.

Sign up free - 14-day trial, no card required