Solicitation NAICS 237990

Murrieta Creek Phase 2B

🏢 DEPT OF DEFENSE 📅 Posted 2025-05-29 ⏳ Due 2025-06-13T20:00:00+00:00
**AMENDMENT 0001 & AMENDMENT 0002 posted to PIEE- Please follow the below provided Links to Soliciation and Amendmnet Updates** The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary and Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics...

Notice ID: 5d2a8ba72826458c9b548b1a969cd7c0 · View on SAM.gov ↗

Explore more federal-contracting data

Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency

Win more federal contracts

BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.

Sign up free - 14-day trial, no card required