Presolicitation
NAICS 238330
Z1DA--RENOVATE BLDG 143 4J SHOWER FLOORS
Requirement Bathrooms in located in Building 143, 4th floor, area J (commonly referred to as 4J) require modification to prevent water from flowing outside of the shower area and ultimately flowing or being tracked outside of the bathroom. An unsafe condition exists and requires a constructive solution. Solution The engineered solution will renovate the 20 bathrooms in Building 143, 4th floor, Area J by demolishing the entire existing flooring in each bathroom. The existing shower area, which is a sub area with the bathroom, attempted to contain and control shower water via a curtain and an accessible threshold/barrier surrounding the sloped shower base. However, water that inevitably escapes the shower area has no path to drainage and ultimately is tracked onto the room flooring creating a dangerous condition. The engineered solution is to demolish all existing interior floor tile finishes, shower threshold and provide a new threshold/barrier free tile installation that provides positive consistent drainage from every corner to the bathroom. To achieve this the existing concrete slab shall be ground and leveled as necessary to enable the finish floor to drain properly to the exist...
Notice ID: 26f4eab7531445df8b6895cda166e80c ·
View on SAM.gov ↗
Explore more federal-contracting data
Browse opportunities by NAICS code · set-aside category · state & jurisdiction · buying agency
Win more federal contracts
BidChamp gives small businesses AI-powered bid writing, document analysis, and recompete forecasting - for free during your trial.
Sign up free - 14-day trial, no card required